Thinking of selling?

Utah's Premier |OnX Realty

  • Nearby me

E-Alert name

Properties

31050 properties match your criteria

This traditional, English-inspired home features elegant finishes unmatched by any comparable property in Salt Lake. Meticulously and thoughtfully remodeled with a true artist's touch, the fine details are evident at every turn-from the solid copper Primo gas lamp at the entry and custom address plate imported from England, to the solid wood doors, beautifully refinished hardwood floors, and custom solid wood inset cabinetry. Beyond the aesthetics, enjoy absolute peace of mind with a comprehensive list of these recent high-ticket mechanical and structural upgrades: a new roof and gutters with a 20-year warranty (2025), a new main water line (2025), a new A/C unit (2025), all-new copper plumbing (2024), a furnace and whole-house humidifier (2023), a new water heater (2022), updated interior electrical (2022) and exterior paint (2026). Summer evenings with friends will be unforgettable in the grassy backyard shaded by a massive and ancient peachleaf willow tree. This one-of-a-kind, piece-of-art Sugar House home has your name all over it! Call or text the listing agent anytime to schedule your private showing!
#2163303

Salt Lake City

1947 E SYLVAN AVE

3 Beds

2 Baths

1,700 Sq.Ft.

$799,000

MLS#: 2163303

Nestled in the desirable Mahogany Ridge neighborhood of Pleasant Grove, this home delivers breathtaking valley views and mountain views with true seclusion. Southern-facing walkout basement is perfect for twilight sunsets over the valley and offers strong potential for an ADU or basement apartment. Three generous living rooms provide flexible space for family living and entertaining. The walkout basement opens directly to a covered deck overlooking premium landscaping, blending indoor comfort with outdoor enjoyment for a serene retreat. Side RV parking. New A/C unit. Estate sale - motivated sellers ready to help this family home go to the next owners.  All information is deemed reliable but not guaranteed. Buyer to verify all listing information, including square footage and acreage, to their own satisfaction.
#2187676

Pleasant Grove

1062 E 1150 N

5 Beds

3 Baths

4,305 Sq.Ft.

$799,000

MLS#: 2187676

Welcome to 9290 Horizon Drive in Eagle Mountain! This spacious 6-bedroom, 4.5-bath home offers an abundance of living space, storage, and flexibility for a variety of needs. The main level features warm and inviting living spaces highlighted by a wood-burning stove, while the kitchen features beautiful butcher block countertops that add warmth and character. The three-car garage provides plenty of room for vehicles, storage, and projects, with a heater in the third bay for added year-round functionality. Freshly installed carpet extends throughout the entire upstairs, along the staircase, and into one of the downstairs bedrooms, adding a clean, updated feel throughout the home. The beautifully finished basement apartment is a standout feature, offering comfortable additional living space with a cozy gas fireplace and a separate den. Thoughtful details include durable LVP flooring designed to resist swelling and extra-height toilets for added accessibility. Outside, the property is especially appealing for anyone who enjoys gardening and recreation. Twenty grow boxes provide plenty of room for vegetables, herbs, and flowers, while five established fruit trees-including apple, pear, and peach-add to the outdoor setting. A concrete pad with a basketball hoop provides a fun spot to shoot hoops, and a large gravel side parking area offers valuable additional space for vehicles and other parking needs. Located in Eagle Mountain, you'll enjoy the area's open spaces, parks, extensive trail system, and abundant opportunities for hiking, biking, and outdoor recreation, while still having convenient access to schools, shopping, dining, and everyday amenities. With six bedrooms, a beautifully finished basement apartment, den, three-car garage, newly installed carpet, extensive gardening setup, fruit trees, recreational space, and generous additional parking, this home offers exceptional versatility inside and out. Seller is open to seller financing. Contact the listing agent for additional information regarding potential terms. Square footage figures are provided as a courtesy estimate only and were obtained from county records.  Buyer is advised to obtain an independent measurement.
#2186185

Eagle Mountain

9290 N HORIZON DR

6 Beds

4 Baths

3,634 Sq.Ft.

$799,000

MLS#: 2186185

Build your mountain retreat at Wildwood Reserve-a premier homesite with sweeping Deer Valley views, year-round amenities, and just minutes from world-class skiing. The perfect opportunity to create a custom home in a luxury alpine setting with easy access to adventure in every season.
#2169076

Kamas

4318 E PANORAMA WAY 92

None Beds

None Baths

1.32 acres

$799,000

MLS#: 2169076

**BEST VALUE IN WASHINGTON COUNTY FOR LOCATION AND SIZE!!**This Hurricane home is a dream property! Its location is near all the popular attractions of Saint George... (boating, mountain biking, hiking, etc.) it backs up to the 11th hole of one of the prettiest golf courses in Southern Utah! You can relax on the large upper deck, and enjoy views of Pine Valley Mountain, and Zions. The custom architecture, three fireplaces, and Travertine floors add a touch of luxury to the home. The theater room is perfect for entertainment, and the interior lighting creates a cozy ambiance. The presence of two primary suites and a second kitchen with a separate entrance adds convenience and flexibility. The outdoor amenities, such as the built-in BBQ, fridge, fire pit, misters, and rope lighting, provide a great space for entertaining friends and family. It's worth mentioning that there is a possibility for a furniture package. Buyer to verify all information, including utilities and HOA details.
#2127551

Hurricane

806 N 2500 W

4 Beds

3 Baths

4,987 Sq.Ft.

$799,000

MLS#: 2127551

Closest resort community to Zion National Park! This proven income-producing vacation rental is located in Zion Village, Southern Utah's premier nightly rental community. One of the largest townhomes in the development, it's perfect for family reunions, corporate retreats, and large groups. Guests love the private hot tub, along with resort-style amenities including a lazy river, pool, splash pad, pickleball courts, fitness center, clubhouse, and complimentary summer s'mores. Just minutes from Zion National Park, Sand Hollow Reservoir, championship golf, hiking, and ATV trails, this home enjoys exceptional year-round demand. Self-management is allowed, giving you greater control and maximizing rental potential. Best of all, this turnkey Airbnb includes an established rental business, transferable Airbnb and Gmail accounts, and outstanding 5-star reviews--making it an incredible investment, vacation home, or both. 2025 Gross Income $73,186, Net income $48,119. 2026 Gross income $43,110, Net income $28,919
#2173956

Hurricane

2064 W 440 N

6 Beds

4 Baths

3,276 Sq.Ft.

$799,000

MLS#: 2173956

Come check out this beautiful serene lot on Layton's East Bench.  It offers mountain and valley views and the sunsets are amazing! It's a perfect location to build your dream home with immediate access to outdoor recreation and easy access to Hwy 89 and I15.   THIS 2.2 ACRE LOT CAN BE SOLD AS SEPARATE LOTS OF 1.4 AND 0.8 ACRES. CALL AGENT FOR MORE INFORMATION.  (Includes parcel #09-081-0216 (0.8 acre lot) Although further subdivision would require city approval there is potential to subdivide into 6 lots between the 2.2 acres.
#2167407

Layton

1792 VALLEY VIEW DR N

None Beds

None Baths

2.2 acres

$799,000

MLS#: 2167407

This home is priced well. Offered with full existing furnishings and family fun amenities. Amenities include a 16' Swim Spa, fun Shuffleboard table, popular stand up gaming console with over 100 well known games, water toys and a Ping Pong table. Imagine living in and experiencing all the amenities in and around Sand Hollow Resort. Access to the Resort includes three pools, Pickleball courts, #1 public Golf Course in Utah, Club House and fine dining at the Clubhouse restaurant. Discounts available to homeowners within the resort. Just a few minutes to Sand Hollow Reservoir and the Sand Dunes OHV areas. The home has 4 huge bedrooms along with 5 bathrooms. A large kitchen area, granite countertops, stainless steel appliances and a huge center island create a wonderful family gathering space. One of the bedrooms is a bunkroom with 6 beds and two bathrooms. A 500+ square foot private courtyard boasts patio type seating along with the swim spa. Up the circular stairs to the rooftop patio/viewing area rewards one with incredible night sky viewing. Close to Zions and other southern utah attractions. Home includes a city approved full fire suppressions system and is being used for short term rentals. Buyer must verify ongoing short term rental status with the HOA. Agent related to seller.
#2161958

Hurricane

3208 S 4900 W

4 Beds

5 Baths

2,606 Sq.Ft.

$799,000

MLS#: 2161958

200 ac. farm located in Tooele County. Remote and secluded. Newer 7 tower Zimmatic Pivot. 16" irrigation well that is 100' deep with 487-acre ft of water rights.  Static water level at 52". The pump is a 40 hp, 650 gpm pump that is driven by a 50 hp electric motor, and that is powered by a 70 kW generator.  Seller also has a permit to drill another culinary/livestock well on the other side of the property that has 153-acre ft of water, permit expires in 2030.  The pivot irrigation system was installed in September of 2024 and covers 100 acres. Seller is currently in the process of getting the exterior fence 32" net and 2 strands of barb wire and gates up (approximately 1/2 completed). 20' x 15' out building. 2000 gallon bulk storage fuel tank. 400 gallon stainless steel fuel tank that gravity feeds the generator. Pivot is set .40" and it takes 24 hours to cover the field and consumes 60 gallons of fuel.
#2179432

Dugway

2000 S OLD RIVER BED RD. W

None Beds

None Baths

N/A

$799,000

MLS#: 2179432

This stunning "Isabella" floor plan in Bella Vita offers the perfect combination of luxury, comfort, and low-maintenance living. Designed for convenient Main-Level living, this home features elevated 10-foot ceilings, a cozy fireplace, wide doorways, minimal stairs, and a curb-less shower for added accessibility and ease. Enjoy upscale finishes throughout, a maintenance-free yard, fenced backyard, energy-efficient construction, and a tankless water heater. The fully finished 9-foot basement provides exceptional additional living space, making this home an incredible value. Currently under construction with estimated completion in June 2026, this is the most affordable detached single-family home in Bella Vita featuring a Fully Finished Basement with 9 ft Ceilings.
#2135685

Mapleton

2227 W FORTUNE LN 448

5 Beds

3 Baths

3,672 Sq.Ft.

$799,000

MLS#: 2135685

Build your dream mountain retreat on one of the few remaining lots in the highly desirable Heritage Hills community. Tucked away on a quiet cul-de-sac, this property showcases incredible panoramic views of Mount Timpanogos and offers a rare sense of privacy. The lot backs to HOA open space and Forest Service land, creating a peaceful natural setting with no rear neighbors. Its sloped terrain is ideal for a custom terraced home designed to take full advantage of the surrounding views and landscape. A unique opportunity to create a one-of-a-kind home in one of the area's most sought-after neighborhoods. Buyers and buyers agents to verify all information provided. Information provided as a courtesy only.
#2158780

Alpine

216 E DEER CREST CIR 307

None Beds

None Baths

0.8 acres

$799,000

MLS#: 2158780

200 ac. farm located in Tooele County. Remote and secluded. Newer 7 tower Zimmatic Pivot. 16" irrigation well that is 100' deep with 487-acre ft of water rights. Static water level at 52". The pump is a 40 hp, 650 gpm pump that is driven by a 50 hp electric motor, and that is powered by a 70 kW generator. Seller also has a permit to drill another culinary/livestock well on the other side of the property that has 153-acre ft of water, permit expires in 2030. The pivot irrigation system was installed in September of 2024 and covers 100 acres. Seller is currently in the process of getting the exterior fence 32" net and 2 strands of barb wire and gates up (approximately 1/2 completed). 20' x 15' out building. 2000 gallon bulk storage fuel tank. 400 gallon stainless steel fuel tank that gravity feeds the generator. Pivot is set .40" and it takes 24 hours to cover the field and consumes 60 gallons of fuel.
#2179456

Dugway

2000 S OLD RIVER BED RD

None Beds

None Baths

200.0 acres

$799,000

MLS#: 2179456

No tricks-just a lot to love about this one! Recent improvements, include new LVP flooring, carpet, trim and fresh paint! Flexible living spaces create possibilities for multigenerational living, while a new roof (2025), detached 3-car garage and low-maintenance xeriscaping add even more value. If you've seen this home before, it's time for another look-the updates are a real treat! Property is also listed as a duplex.  MLS# 2154420 PLEASE VIEW TOUR #2 TO VIEW RECENT INTERIOR UPDATES
#2154413

Salt Lake City

1645 E 2700 S

5 Beds

2 Baths

3,504 Sq.Ft.

$799,000

MLS#: 2154413

Ideally situated along Utah's iconic Highway 12 Scenic Byway at the gateway to the Grand Staircase-Escalante National Monument, the Loubird Inn is a thoughtfully restored 1905 homestead reimagined as an art-forward retreat in the heart of Escalante. Featuring curated interiors, lush gardens, and inviting outdoor spaces that inspire connection, reflection and relaxation, this is an exceptional opportunity to own a distinctive hospitality property with an established brand, loyal guest following, and room for growth- all in one of Southern Utah's most unique, and increasingly popular travel destinations.

This highly rated Inn is within walking distance to local shops and dining and attracts both domestic and international travelers seeking a place to rest and renew after a day on the road or hiking trails. 
 
The property currently features four private, creatively designed guest suites, each with en-suite baths, private entrances, and modern comforts, as well as a two-bedroom home ideal for owner occupancy or additional rental income. 
Other significant features include-

Two RV pads with full hookups (sewer, water, electric)

A detached garage that serves as the laundry facilities and storage for the Inn (could potentially be converted to living quarters). 

.5 shares of New Escalante Irrigation District water. 

All FF&E 

Two separate parcels totalling .79 acres of commercial/residential zoning offers flexibility for expansion.

The Loubird Inn is truly the jewel of Escalante, Utah. With high visibility properties of this caliber rarely coming available in this charming little town, this is an exceptional opportunity to buy and expand on what is already a highly successful business.
#26-271268

Escalante

15 S 100 E

None Beds

None Baths

3,000 Sq.Ft.

$799,000

MLS#: 26-271268

Better than new and loaded with upgrades, this exceptional Desert Color home truly has it all. Thoughtfully designed with luxury, comfort, and functionality in mind, this is elevated living in Southern Utah's most desirable resort community.

Filled with abundant natural light, this beautifully appointed home blends an open concept floor plan with elements of modern design, perfect for both everyday living and entertaining. Featuring 5 spacious bedrooms including a downstairs master, a dedicated formal office, a versatile activity room, and an open kitchen with large center island, there is plenty of space for work, fitness, relaxation, and gathering.

With over $30,000 in post-purchase upgrades, this home is move-in ready with added amenities including additional cabinets and lighting, a water filtration and softening system, an amazing epoxy garage floor, and custom window shades throughout. With brand-new flooring on the main level, double ovens, and conveniences such as washer and dryer hookups on both levels, this house truly stands out from any others available.

In addition to the traditional 2-car garage, another standout feature is the huge and incredibly deep RV garage.  Currently set up as a premium home gym, this space offers endless flexibility for fitness enthusiasts, storage needs, recreational vehicles, or extra parking.

The options for outdoor living are equally impressive. Take advantage of the quiet of Desert Color as you enjoy peaceful mornings on the large covered front porch with comfortable sitting space.  Unwind in the evenings under the covered backyard patio dining area as you listen to your tunes emanating from the array of high-fidelity satellite speakers with in-ground bass.  Or assemble with friends and family on the generous backyard turf for a head-to-head game of Kan Jam or Bocce.  Whatever your preference, it's perfect for entertaining, family dinners, or just relaxing during those cool desert evenings.

Low-maintenance is delivered thanks to the combination of beautiful desert landscaping and the multi-zoned Rain Bird in-ground irrigation system (with wireless upgrade) that allows you to spend less time on yard work and more time enjoying the incredible lifestyle this community affords.  And just for fun, thanks to this combination, this house now boasts the largest yellow ice plant of any in Desert Color (not kidding) that you've just got to see to appreciate!

Although there is so much to say about the home, it's the location that makes it truly hard to beat. The newest resident-only pool and hot tub is directly across the street, giving you convenient walking-distance access to one of Desert Color's most desirable amenities. In addition, your HOA dues also include access to Desert Color's resort centerpiece -- the 2.6 acre lagoon surrounded by white sands, restaurants, snack stands, board rentals, and plenty of lagoon-side seating.  As a resident, your HOA also includes access to the additional resident-only pool and hot tub (north of the lagoon), 6 private pickle ball courts, and Quantum Fiber in-home, high-speed internet.  Within Desert Color, you also get to enjoy the scenic walking and biking trails woven throughout the community, making it easy to stay active and connected to the beautiful surroundings.

Desert Color continues to grow as one of Southern Utah's premier lifestyle communities, with exciting nearby establishments including the newly opened Costco, the forthcoming Megaplex theater (under construction), Crush Golf, the new Med Spa, Nail Salon, and your choice of several Credit Unions.  In addition, there is an ever-increasing number of popular dining options like Jersey Mike's, Chipotle, Mo' Bettahs, Pizza Hut, Peachwave, Panda Express, and Swig, with the new In-N-Out Burger and Smith's Food & Drug just down the street.  Located in the section of Desert Color not zoned for nightly rentals, the Sage Haven neighborhood offers the quieter, more residential atmosphere you want while still delivering all the benefits of resort-style living you're after.

If interested, select personal property is also available for purchase with the home, including the West Elm sofa, custom designed for the living room space, as well as the equipment in the home gym, to make your transition to Desert Color even easier.

This exceptional home is meticulously maintained, owner-occupied, and an exceptional value with necessary upgrades already in place. Come experience the lifestyle, comfort, and convenience for yourself--schedule your private showing today.
#26-273687

St George

629 W SPRING LILY DR

5 Beds

None Baths

2,979 Sq.Ft.

$799,000

MLS#: 26-273687

* Listings identified with the FMLS IDX logo come from FMLS and are held by brokerage firms other than the owner of this website. The listing brokerage is identified in any listing details. Information is deemed reliable but is not guaranteed. If you believe any FMLS listing contains material that infringes your copyrighted work please review our DMCA policy and learn how to submit a takedown request. © 2024. First Multiple Listing Service, Inc.

Categories

Homes Tailored to Your Lifestyle

Buyers Guide

Buying a home is one of the most exciting milestones of your life.

View more

Sellers Guide

Putting your home on the market can be a stressful process, especially when you don’t know what to expect.

View more

Market report

With just a few clicks, you'll gain instant access to valuable insights about the real estate market, including trends, property values, and community analytics.

View more

Home value

Unlike automated valuations, our hands-on review will provide a comprehensive opinion of your home’s value while considering important interior elements and other location intangible factors that machine algorithms so often miss.

View more

Buyers resources

Guides on financing, inspections, and choosing the right Realtor for a smooth home purchase.

Sellers resources

Practical tips on staging, pricing, and preparing your home to attract buyers and maximize your sale.

Send a message

Message successfully sent.

Reason for contacting?

I agree to receive email communication and understand I can unsubscribe at any time.

I agree to be contacted by OnX Realty via call, email, and text for real estate services. To opt out, you can reply 'stop' at any time or reply 'help' for assistance. You can also click the unsubscribe link in the emails. Message and data rates may apply. Message frequency may vary. Privacy Policy

Sign In Sign Out

Virtual Assistant

Would you like to take the next step with this property? We can help you schedule a showing or virtual tour, or send you more details.

Yes, I would like more information.

Thank You for Your Reply, One of Our Agents will contact you as soon as possible

No, maybe later.

Thank you, you can always contact me via email, phone number or through the contact form.

Realhub AI

Lucy - Your AI-Powered Realtor

Update Your Temporary Password

Personalize your search

Enter your email and we'll notify you immediately when new listings match what you're looking for.

or enter email address

Already have an account ? Login here

Continue your home search

I agree to receive communications and understand I can unsubscribe at any time.

I agree to be contacted by OnX Realty via call, email, and text for real estate services. To opt out, you can reply 'stop' at any time or reply 'help' for assistance. You can also click the unsubscribe link in the emails. Message and data rates may apply. Message frequency may vary. Privacy Policy

Already have an account ? Login here

We use cookies

We use cookies primarily for analytics to enhance your experience. By accepting, you agree to our use of these cookies. You can manage your preferences or learn more about our cookies policy.